Planned for small manufacturers and fabricators Coming soon
Know what you made. Know what it cost.
Know what went into a run, what came out, and what it cost. Keep materials, output and outside work connected to the work order.
This business type is not open yet. Tell us you want it and we will tell you the day it is.
No card, no cost. Example shop and orders: this is the plan, not a live product.
One order, start to finish
How an order moves through Vaani Industries.
- 1Work order
Work order raised against a customer order or forecast
- 2Material issued
Material issued from stock; the run opens on the floor
- 3QC · packed
Output and scrap recorded; QC and packing marked on the phone
- 4Booked
Dispatched with a challan; invoiced; cost and margin booked
Made for small manufacturers and fabricators
What Tuskit will keep for you.
One-level bill of materials with wastage
Inputs, expected yield and allowed wastage, versioned. A closed run keeps the BOM version it consumed.
Runs record actual against expected
Output, scrap and the cost of both. Material, labour and overhead roll into the cost of what you made.
Job work that keeps its ITC
Rule 55 challans, the e-way bill when needed, and the 365-day clock so credit is never reversed by surprise.
Fabrication jobs on site
Site measurement, outside work, installation — each recorded as a stage of the job, on the fitter's phone.
Try it
See what the run actually produced.
Compare actual output with the plan before reviewing the run’s cost.
Material issued · run in progress
Record the output and scrap against the same run
Also see
Every order in one place. Nothing slips.
Small manufacturing is not open yet. Tell us you want it and we will tell you the day it is.
No card · no cost
Every order in one place. Nothing slips. In Tamil, Hindi and English.